Audi 100

1982-1990 of release




Audi 100
+ 1.1. Controls and devices
+ 2. Technical characteristics
- 3. Engines
   + 3.1. Four-cylinder engines
   + 3.2. Five-cylinder engines
   - 3.3. The diesel engine
      3.3.1. Check of a tension of a belt of a drive of the fuel pump of a high pressure
      3.3.2. Adjustment of a tension of a belt of drive ТНВД
      3.3.3. Check of candles накаливания
+ 4. Cooling system
+ 5. An exhaust system
+ 6. The power supply system
+ 7. Transmission
+ 8. A running gear
+ 9. A steering
+ 10. Brake system
+ 11. A body
+ 12. An electric equipment


full production support in Cyprus



3.3.2. Adjustment of a tension of a belt of drive ТНВД
PERFORMANCE ORDER
1. To establish adaptation VW210. Rotating the handle, to tighten a spring on 12-13 scale units.
2. To weaken an inhaling of bolts of fastening THBД and, moving the pump upwards or downwards, as is shown in drawing, to establish a demanded tension of a belt. To tighten bolts of fastening ТНВД.
3. To turn a cranked shaft on one turn and to check up a belt tension. If it is required, to repeat tension adjustment.
4. To check up, that labels of century of m. т. Coincided. Otherwise to check up the beginning of giving of fuel the high pressure pump. It can be made only at servicing deport, using the special equipment.
5. To establish a cover 33 (fig. the Diesel engine see).
6. If near at hand there is no adaptation for the control of a tension of a belt, he can be pulled so that it was overwound big and index by fingers no more than on 45 °. As soon as possible the belt tension should be checked up the adaptation. Until then avoid engine work on high turns