Audi 100

1982-1990 of release




Audi 100
+ 1.1. Controls and devices
+ 2. Technical characteristics
+ 3. Engines
+ 4. Cooling system
+ 5. An exhaust system
- 6. The power supply system
   - 6.1. The power supply system of carburettor engines
      6.1.1. Replacement of a filtering element of the air filter
      6.1.2. Removal and installation of the air filter
      6.1.3. Temperature regulator check
      6.1.4. Check of the valve of a temperature regulator
      6.1.5. Removal and installation of the fuel pump
      6.1.6. Check of pressure of forcing of the fuel pump
      6.1.7. Removal and installation of a cable of a drive of an accelerator
      6.1.8. Adjustment of a cable of a drive of an accelerator
      6.1.9. Replacement of the gauge of level of fuel
      6.1.10. Removal and installation of a fuel tank
      6.1.11. Replacement of the filter of thin clearing of fuel
      6.1.12. Removal and carburettor installation
      + 6.1.13. Dismantling and carburettor assemblage
      + 6.1.14. Carburettor Pierburg adjustments 1B3
      - 6.1.15. Carburettor Pierburg adjustments 2Е2
         6.1.15.1. Adjustment of frequency of rotation of start-up of the engine
         6.1.15.2. Adjustment of starting backlashes air flaps
         6.1.15.3. Check of a pneumodrive throttle flaps the second chamber
         6.1.15.4. Adjustment приоткрытия throttle flaps the second chamber
         6.1.15.5. Adjustment of the accelerating pump
         6.1.15.6. Check of work of a pneumodrive throttle flaps the first chamber
         6.1.15.7. Idling adjustment
      + 6.1.16. Carburettor Keihin adjustments
   + 6.2. The power supply system of engines with fuel injection
   + 6.3. The power supply system of the diesel engine
+ 7. Transmission
+ 8. A running gear
+ 9. A steering
+ 10. Brake system
+ 11. A body
+ 12. An electric equipment





6.1.15.3. Check of a pneumodrive throttle flaps the second chamber
PERFORMANCE ORDER
1. To connect to a pneumodrive (fig. of the Detail of the carburettor 2Е2) the vacuum gauge and the vacuum pump see and to create in a pneumodrive depression 50 мбар. If it does not fall during 2 mines, the pneumodrive is tight.
2. Completely to open throttle flap the first chamber, supporting depression 50 мбар in a pneumodrive throttle flaps the second chamber. Throttle заслонка the second chamber should open completely. If throttle заслонка the second chamber has opened or has opened completely, the pneumodrive flaps means is faulty also it it is necessary to replace.